System Approvals

2024-01-19T15:36:59+00:00

The radio equipment directive 2014/53/EU (RED) establishes a regulatory framework for placing radio equipment on the market. It ensures a

System Approvals2024-01-19T15:36:59+00:00

Operating Frequencies

2024-01-19T14:47:20+00:00

For the regions where Hochiki has a commercial presence, Ekho is available pre-configured to operate within the frequency allocated by

Operating Frequencies2024-01-19T14:47:20+00:00

System Performance

2024-01-19T14:09:04+00:00

These tables summarise Ekho's performance in other aspects, compared to our previous hybrid wireless system, FIREwave.

System Performance2024-01-19T14:09:04+00:00

System Operational Ranges

2024-01-19T14:46:31+00:00

These tables summarise Ekho's operational ranges, compared to our previous hybrid wireless system, FIREwave. NOTE: As per BS 5839-1, a

System Operational Ranges2024-01-19T14:46:31+00:00

System Capacity

2024-01-19T14:45:07+00:00

These tables summarise Ekho's operational capacity, compared to our previous hybrid wireless system, FIREwave.

System Capacity2024-01-19T14:45:07+00:00

Key Features of Ekho (contd)

2024-02-02T09:58:43+00:00

When it comes to Hybrid Wireless systems, Ekho has a number of key features that make it the number one

Key Features of Ekho (contd)2024-02-02T09:58:43+00:00

Key Features of Ekho

2024-01-19T14:43:09+00:00

When it comes to Hybrid Wireless systems, Ekho has a number of key features that makes it the number one

Key Features of Ekho2024-01-19T14:43:09+00:00
Go to Top